
Stainless Steel Water Tank
Key Advantages:
- Made from high-quality SUS304 stainless steel for hygienic and safe water storage
- Excellent corrosion resistance suitable for potable water applications
- Smooth internal surface that prevents contamination and bacterial growth
- Durable structure with long service life and low maintenance requirements
- Modular sectional design for flexible installation and expansion
Typical Applications of Stainless Steel Water Tank:
- Potable water storage for residential and commercial buildings
- Municipal Drinking Water Supply Systems
- Hospitals, Hotels, and Schools Water Storage
- Food Processing and Pharmaceutical Industry Water Storage
- High-Rise Building Booster Water Systems
GRP/FRP Water Tank
Key Advantages:
- Manufactured from high-strength glass reinforced plastic (GRP) panels
- Lightweight structure with excellent corrosion resistance
- Non-conductive and suitable for various environmental conditions
- Modular panel system for easy transportation and on-site assembly
- Long service life with minimal maintenance
Typical Applications of GRP Water Tank:
- Fire fighting water storage systems
- Commercial and industrial building water supply
- Rainwater harvesting and water recycling systems
- Industrial process water storage
- High-Rise Building Booster Water Systems


Stainless Steel Composite Water Tank
Key Advantages:
- Composite structure combining SUS304 stainless steel and galvanized steel
- Hygienic stainless steel inner layer suitable for potable water storage
- Reinforced structural strength with galvanized steel backing plate
- Excellent corrosion resistance and extended service life
- More cost-effective than full stainless steel water tanks
Typical Applications of Stainless Steel Composite Water Tank:
- Municipal water supply and infrastructure projects
- Fire fighting water storage systems
- Industrial water storage for factories and plants
- Agricultural irrigation water storage systems
- Commercial and residential building water supply
Double-sided Arc-Rib Reinforced Water Tank
Key Advantages:
- Ultra-high structural rigidity
- Advanced arc-rib pressure dispersion structure
- Internal tie-rod free design and easy to maintain
- Flexible composite material options
- Modular large-panel construction
Typical Applications of Double-sided Arc-Rib Reinforced Water Tank:
- Large-capacity municipal water storage systems
- Fire fighting water storage systems
- Rainwater harvesting and water recycling systems
- Commercial and infrastructure water supply systems
- Agricultural irrigation water storage projects

Water Tank & Water Supply System Projects
Our products are suitable for various different situations.

Intelligent Fire Pump Station for Wind Farm
Qingyun · China
✓ 24/7 Real-Time Monitoring
✓ Energy-Efficient Pump Control
✓ Modular Water Storage System
Engineered to provide stable fire protection and automated operation for renewable energy infrastructure with reduced maintenance requirements.

Integrated Fire Pump Station for 100MW PV Plant
Chizhou · China
✓ 303 m³ Effective Capacity
✓ Compact Integrated Design
✓ 60% Faster Emergency Response
LeAqua delivered a compact integrated fire pump station for a 100MW PV substation. Combines storage, pumping & smart controls — faster response, less water, reliable long-term operation.

Smart Booster Pump Station for Regional Water Supply
Jianhu · China
✓ Split-Level Tank-Pump Design
✓ Modular SS Water Storage
✓ IoT Remote Monitoring
Integrated intelligent booster station designed to improve water pressure stability, optimize land use, and enable automated regional water supply management.

Integrated Water Supply System for Presidential Palace
Lomé · Republic of Togo
✓ 500 m³ Modular Water Tank
✓ Fire & Domestic Pump Stations
✓ Sewage Lifting System
Complete integrated water infrastructure combining fire protection, domestic water supply, pressure stabilization, and wastewater management for a government complex.

Integrated Fire Water Supply System for Yangon Shipyard
Yangon · Myanmar
✓ 21 × 12 × 3 m Smart Pump Station
✓ SW Modular 316 Structure
✓ Reliable Fire Protection
Engineered to deliver dependable fire water supply for a major shipyard using a modular SW stainless steel pump station with integrated fire pumps and long-term corrosion resistance.

Integrated Fire Pump Station for CLOU Energy Storage
Batam · Indonesia
✓ 640 m³ Effective Capacity
✓ Integrated Above-Ground Fire Pump Station
✓ On-Time Delivery in a Remote Island Environment
LeAqua delivered an integrated fire protection system for CLOU Energy Storage, combining 640 m³ of water storage with hydrant and fire monitor pump systems. Despite limited local resources, power constraints, communication challenges, and a demanding schedule, the project was completed on time.
Our Factory












Water Tank Technical Insights
-

Water Tank Procurement for Reconstruction Projects
Plan water tank procurement for post-conflict and disaster recovery projects. Compare temporary supply, permanent storage, interfaces and records.
-
Water Tank Leak Test: Procedure and Acceptance Checklist
Plan a water tank leak test with checks for joints, fittings, filling conditions and acceptance records. See what to confirm before your tank is handed over.
-

Can You Expand a Water Tank Later? Key Checks
Find out when a modular water tank can be expanded and what to check in the existing structure, foundation, panel compatibility, pipework and operating plan.
-

Water Tank Installation Cost: What Affects the Total Project Price?
Learn what affects water tank installation cost, including tank type, foundation, shipping, piping, lifting equipment, controls and commissioning.
-

Water Tank Roof Installation: Structural Load, Access and Maintenance Clearance
Plan a roof-mounted water tank with coordinated structural loads, access hatches, pipework, maintenance clearance and safe inspection details before approval.
-

Water Tank Technical Submittal Checklist: Drawings, Data Sheets and Approval Records
Use this water tank technical submittal checklist to organize drawings, calculations, data sheets, certificates, tests and approval records before approval.


