Engineering background

From technical references to real equipment

LeAqua’s engineering capabilities are backed by the manufacturing and project experience of Jiangsu Mingxing Water Supply Equipment Co., Ltd.

Our technical work covers water storage, water supply, pumping systems, and integrated water supply solutions. Beyond equipment manufacturing, our team has participated in relevant technical references and engineering standard work, providing a documented connection between technical development and practical equipment applications.

Among the references presented on this page, Jiangsu Mingxing Water Supply Equipment Co., Ltd. is identified as a lead organization for 24CS01-1,T/CECS 623-2019, DB42/T 2513-2026 the current national architectural standard design atlas for intelligent prefabricated integrated fire water supply pump stations.

Other references, including 18CS01, 16S111, Su S08-2015, and other unspecified references, which all play the role of Participating Organization.

The purpose of this page is therefore not simply to list standards. It is to provide traceable technical references that allow engineers, specifiers, and procurement teams to understand and verify the engineering background behind LeAqua’s equipment and solutions.

LeAqua integrated fire pump station and water tank installation
A technical reference becomes useful when it can be connected to a real water system.

Reference documents

Selected Current Technical References

The references below document LeAqua’s engineering background in integrated fire pump stations and related water supply systems. They include national and local standards and design atlases in which Jiangsu Mingxing Water Supply Equipment Co., Ltd., the manufacturing and engineering organization behind LeAqua, is identified as a lead, drafting, or participating organization.

Current · National Architectural Standard Design Atlas

24CS01-1

Official title: Selection and Installation of Prefabricated Integrated Fire Water Supply Pump Stations (I) — Intelligent Type

  • Role: Lead Organization
  • Technical connection: Mingxing is identified as a lead organization for this national reference atlas for intelligent prefabricated integrated fire water supply pump stations.

Current · Hubei Local Standard

DB42/T 2513-2026

Official title: Technical Standard for Intelligent Integrated Fire Pump Stations

  • Role: Drafting Organization
  • Technical connection: Mingxing is listed among the drafting organizations for this technical standard for intelligent integrated fire pump stations.

Current · CECS Technical Standard

T/CECS 623-2019

Official title: Technical Specification for Prefabricated Integrated Tank and Pump Stations for Fire Water Supply

  • Role: Lead Organization
  • Technical connection: Mingxing is identified as a lead organization for this technical specification covering the design, installation, commissioning, acceptance, and maintenance of integrated fire pump stations.

Current · Jiangsu Local Design Atlas

Su S08-2015

Official title: Design Atlas for Integrated Water Tank and Pump Stations

  • Role: Participating Organization
  • Technical connection: Mingxing is listed as a participating organization in this Jiangsu design atlas for integrated tank and pump station systems.

Make the technical story visual

How the references connect to practical systems

Customers should not have to infer the product connection from a long document list. The images below give each technical area a visible application context.

Stainless steel water tank for water storage
Water tank solutions for storage, hygiene, and corrosion-resistance requirements.
Bolted modular stainless steel water tank
Modular bolted water tanks for transportation, restricted access, and on-site assembly.
FRP GRP modular water tank
FRP/GRP tank options for corrosion-sensitive environments and lighter handling.

Integrated fire pump stations

24CS01-1 and 18CS01 relate most directly to integrated fire water supply pump station applications, including the coordination of storage, pumping, controls, and access.

Water supply equipment

16S111 provides context for variable-frequency water supply equipment. Final pump duty, pressure, flow, redundancy, and control logic remain project decisions.

Sewage-elevating systems

T/CECS 463-2017 covers application, design, installation, testing, acceptance, and maintenance considerations for sewage-elevating devices.

A quick history

References History

Use this timeline to avoid confusing similar document numbers. The 18CS01 reference is historical; 24CS01-1 is the current edition for the intelligent prefabricated integrated fire water supply pump station reference.

2015

Su S08-2015

Participating Organization

2019

T/CECS 623-2019

Lead Organization

2025

24CS01-1

Lead Organization

2026

DB42/T 2513-2026

Drafting Organization

Important for overseas projects

Technical References Do Not Replace Local Compliance

LeAqua’s experience with Chinese reference atlases, association standards, and engineering practices forms part of our technical background. However, these references should not be interpreted as automatic compliance with NFPA, EN, UL, FM, or other standards and certification requirements applicable in the destination market.

For overseas projects, equipment and system designs must be evaluated against the requirements that apply to the specific project and jurisdiction. This distinction allows our technical experience to serve as an engineering foundation without making unsupported compliance claims.

What Should Be Confirmed Before Equipment Selection?

Before specifying equipment, the project team should confirm:

  • Applicable local codes and standards
  • Authority and approval requirements
  • Fire protection and water supply requirements
  • Project specifications and design criteria
  • Water quality and operating conditions
  • Installation environment and site constraints
  • Required product certifications or test reports

These requirements may affect the selection of tank material, structure, capacity, pump configuration, controls, and other system components.

What Information Helps Us Evaluate an Overseas Project?

  • Project location and applicable authority requirements
  • Application: potable, fire, industrial, rainwater, or sewage
  • Required capacity, flow, pressure, and storage duration
  • Installation environment, access, foundation, and space limits
  • Water quality, temperature, and corrosion exposure
  • Required drawings, certificates, standards, and delivery schedule

Answers for specifiers and procurement teams

Technical References FAQ

24CS01-1 is the current national architectural standard design atlas for selection and installation of intelligent prefabricated integrated fire water supply pump stations. The official platform lists it as current with an implementation date of January 1, 2025.

T/CECS 623-2019 is a CECS technical specification for integrated fire pump stations with assembled tanks and pump houses. Jiangsu Mingxing Water Supply Equipment Co., Ltd. is identified as a lead organization in the preparation of the specification. It provides a technical reference for the design, installation, commissioning, acceptance, and maintenance of integrated fire pump station systems.

Su S08-2015 is a Jiangsu design atlas for integrated tank and pump stations. Jiangsu Mingxing Water Supply Equipment Co., Ltd. is listed as a participating organization. The reference provides engineering guidance for integrated tank and pump station applications within its applicable scope.

DB42/T 2513-2026 is a Hubei local technical standard for intelligent integrated fire pump stations. Jiangsu Mingxing Water Supply Equipment Co., Ltd. is listed among the drafting organizations. The standard provides technical requirements for the design, installation, commissioning, acceptance, and operation of intelligent integrated fire pump stations.

LeAqua presents the engineering and R&D capabilities associated with Jiangsu Mingxing Water Supply Equipment Co., Ltd. Where the original reference identifies Mingxing as a lead, drafting, or participating organization, this page uses that documented relationship rather than attributing the formal role directly to the LeAqua brand.

Not necessarily.

Chinese standards and design atlases should not be treated as automatic substitutes for the codes and regulations applicable in another country. For overseas projects, the final design should follow the local building codes, fire regulations, water supply standards, authority requirements, project specifications, and required certifications.

Our experience with Chinese standards provides additional engineering reference and design experience, while the project-specific solution is adapted to the requirements of the target market.

For an initial engineering evaluation, we normally need:

  • Project location
  • Application and water usage
  • Required water storage capacity
  • Required flow rate and pressure
  • Pump duty and operating conditions
  • Installation environment and available space
  • Applicable local codes and standards
  • Required certifications or approvals
  • Project schedule

Based on this information, our engineering team can evaluate the appropriate water tank, pump system, integrated pump station, or complete water supply solution for the project.

Traceable sources

Reference sources

The sources below provide supporting records for selected technical standards, certifications, qualifications, and other documented evidence presented on this page. Where available, links lead to the issuing organization, certification body, or official source for independent verification.

ReferenceOfficial RecordStatus in Official Source
24CS01-1China Building Standard Design & Research electronic book platformCurrent
DB42/T 2513-2026National Public Service Platform for Standards InformationCurrent
T/CECS 623-2019China Association for Engineering Construction Standardization official noticeCurrent
Su S08-2015China Building Standard Design & Research electronic book platformCurrent
SGS AuditThird-Party AuditCurrent

Reference status and applicability may change. Always consult the linked source and applicable project requirements before using a reference for design, procurement, approval, or compliance purposes.

Need help selecting a water tank or pump station?

Send your project parameters and LeAqua’s engineering team can evaluate a suitable tank material, structure, pump station, and documentation path for your application.

  • Project location
  • Application and water type
  • Required capacity and duty
  • Installation conditions
  • Applicable codes or certifications

Get A Quotation

Get personalized solutions and pricing for your water storage needs.

Blank Form (#3)

Looking for an Engineering Water System Solution?

Explore LeAqua’s integrated pump stations, water tanks, and water supply solutions for project-specific applications.

📄 Get a Quote 📘 Catalog Top